CRE Construction Loan & Draw Lab

Simulate commercial real estate development debt, monthly S-curve draw schedules, capitalized interest reserves, retainage holdbacks, and permanent take-out sizing.

Preloads empirical land costs, hard/soft cost splits, S-curve draw durations, and take-out debt yields.
Total Gross Budget
$0M
Costs + Int. Reserve
Loan Commitment
$0M
Bank facility size
Interest Reserve
$0M
Capitalized IDC
Yield on Cost
0.0%
Stabilized NOI / Cost
Refi Cash-Out
$0M
Take-out equity return

Development & Debt Parameters

1. Development Costs & Sizing

Site acquisition and physical vertical construction GMP contract.
Architecture, engineering, permitting, legal, and contingency reserve.
Senior construction bank advance rate and ground-up build horizon.

2. Construction Loan Pricing & Terms

Floating benchmark interest rate and credit spread on drawn funds.
Non-utilization commitment fee and contractor holdback percentage.

3. Permanent Take-Out Refinancing

Net operating income generated at target stabilized occupancy (~93-95%).
Take-out exit cap rate, lender debt yield hurdle, and loan-to-value cap.

Total Capital Stack & Uses of Funds

Budget Category Amount % of Total Funding Source

Permanent Take-Out Sizing & Refinance Return

Refinance Underwriting Metric Sized Amount Underwriting Detail

Interest Reserve & Refi Cash-Out Sensitivity

SOFR vs. Build Duration

Capitalized Interest Reserve ($M) and Net Refinance Proceeds ($M) across varying base SOFR rates and construction delays.

Base SOFR Scenario Accelerated (-4 Mo) Baseline Duration Delayed (+4 Mo)

Construction Loan & Take-Out Mathematical Formulation

1. Sigmoid S-Curve Cumulative Spend Progression

$$S(t) = \frac{1}{1 + e^{-k(t/T - 0.5)}} \quad \implies \quad \text{Spend}_m = \text{Budget}_{\text{hard+soft}} \times \Delta S_m$$

Standard logistic S-curve modeling slow project mobilization, vertical structural acceleration, and finish-stage tapering over total construction duration $T$.

2. Capitalized Interest During Construction (IDC)

$$\text{IDC}_m = \left(B_{m-1} + \frac{\Delta \text{Draw}_m}{2}\right) \times \frac{r_{\text{SOFR}} + \text{Spread}}{12} + (C_{\text{loan}} - B_m) \times \frac{f_{\text{unused}}}{12}$$

Accrues interest on average monthly drawn debt plus non-utilization commitment fees on undrawn facility lines, capitalized directly into the bank interest reserve.

3. Permanent Take-Out Loan Sizing

$$L_{\text{perm}} = \min\left(\frac{\text{NOI}_{\text{stab}}}{\text{Cap Rate}} \times \text{LTV}_{\text{max}}, \ \frac{\text{NOI}_{\text{stab}}}{\text{Debt Yield}_{\text{min}}}\right)$$

Determines the binding permanent refinance debt capacity by taking the minimum of the loan-to-value ceiling and the required institutional debt yield.

Frequently Asked Questions

An S-curve draw schedule models the non-linear cumulative capital expenditure of ground-up real estate development. Outlays start slowly during site prep and foundation excavation, accelerate rapidly during vertical framing, enclosure, and MEP installation, and taper off as the project reaches interior finishes, commissioning, and Certificate of Occupancy (C of O).

Because non-income-producing development assets generate zero operational revenue during construction, lenders size an Interest Reserve inside the loan commitment. Each month, interest accrues on the average drawn balance at SOFR plus spread, plus unused line fees on undrawn balances, and is added to the loan balance.

Retainage is typically a 5% to 10% holdback withheld from general contractor progress payment applications (AIA G702/G703). The lender and owner retain these funds as security against construction defects, punch list items, or mechanic's liens, releasing the balance upon Substantial Completion and lien waiver execution.

Permanent take-out lenders size long-term fixed-rate debt based on the lower of maximum Loan-to-Value (typically 60% to 65% of stabilized market value) and minimum Debt Yield (typically 9.0% to 10.0% of stabilized Net Operating Income). If the permanent loan proceeds exceed the final drawn construction balance, the sponsor achieves a tax-deferred cash-out return of equity.

Explore Related Commercial Real Estate Finance Simulators

CRE Refinance Gap Lab

Model maturing mortgage debt shortfalls, higher cap rates, and sponsor rescue equity requirements.

CRE Mezzanine Debt Lab

Model subordinate debt tranches, intercreditor rights, mezzanine cash sweeps, and UCC foreclosures.

CRE Special Servicing Lab

Model distressed CMBS debt workouts, appraisal reduction amounts (ARA), and A/B note bifurcations.

CRE CLO Securitization Lab

Model transitional commercial bridge loan securitizations, reinvestment periods, and ramp-up pools.