FAQ
OEE and lean manufacturing questions
What is Overall Equipment Effectiveness (OEE) and why is it used?
OEE is the gold-standard metric for measuring manufacturing and operational productivity. It multiplies Availability (uptime), Performance (speed), and Quality (good output) to reveal truly productive production time.
What is considered a World-Class OEE benchmark?
World-Class OEE is generally considered to be 85% or higher (representing 90% Availability, 95% Performance, and 99.9% Quality). Typical manufacturing operations achieve 60% to 75%.
What are the Six Big Losses in TPM?
The Six Big Losses are: 1) Equipment Breakdowns, 2) Setup and Changeover, 3) Idling and Minor Stops, 4) Reduced Operating Speed, 5) Process Defects and Scrap, and 6) Startup Yield Losses.
How does OEE connect to cost of quality and profitability?
Low OEE wastes machine capacity, requires expensive overtime, creates inventory shortages, and generates scrap costs. Improving OEE converts fixed overhead into billable output without buying new equipment.
Can I export OEE shift reports to CSV?
Yes. You can export complete shift times, availability, performance, quality percentages, Six Big Losses minutes, and lost capacity values as a UTF-8 CSV spreadsheet with formula injection defense or print an executive brief.
Is this tool certified industrial engineering consulting or ISO compliance auditing?
No. This tool provides simplified educational operations models for manufacturing and business education without formal engineering certification, machine safety sign-off, or ISO 9001 compliance audit.