Vanadium Extraction & VRFB Electrolyte Lab
Model titanomagnetite (VTM) ore sodium salt roasting at 850°C (), water leaching, ammonium metavanadate (AMV) crystallization, flake calcination, ultra-pure 1.8M Vanadium Redox Flow Battery (VRFB) electrolyte, aerospace 65/35 V-Al master alloys, and 20-year project finance.
Refinery & Electrolyte Parameters
First-PrinciplesIntegrated Vanadium Extraction & Energy Storage Hub
Thermochemical CircuitAnnual Revenue Streams
| Product Stream | Annual Revenue |
|---|---|
| VRFB 1.8M Ultra-Pure Electrolyte | $59.75M |
| Aerospace 65/35 V-Al Master Alloy | $46.82M |
| Ferrovanadium (FeV80) Rebar Steel Additive | $25.83M |
| Total Gross Annual Revenue | $132.40M |
Annual Operating Expenditures (OPEX)
| Cost Driver Category | Annual OPEX |
|---|---|
| Sodium Carbonate (Soda Ash) Reagents | $1.08M |
| Mining Beneficiation / Slag Handling | $7.20M |
| Rotary Kiln Thermal Roasting Energy (850°C) | $2.04M |
| Water Leaching & AMV Crystallization Chemicals | $3.26M |
| Electrolyte Dissolution & Aluminothermic Finishing | $13.62M |
| Fixed Labor, Environmental Scrubbing & SG&A | $12.50M |
| Total Annual Operating Costs | $39.70M |
20-Year Project NPV Sensitivity ($M USD)
Stress-test project financial resilience across variations in Feed Grade () and Benchmark Flake Pricing ().
| Feed Grade \ Market Price | -20% Price | -10% Price | Base Price | +10% Price | +20% Price |
|---|
Extractive Roasting & Precipitation Chemistry
Vanadium locked within the trivalent iron titanomagnetite spinel lattice () is oxidized to pentavalent and converted to water-soluble sodium metavanadate ().
Ammonium metavanadate () crystals precipitate at pH 8.0–8.5, are separated by continuous vacuum belt filtration, and thermal deammoniated at 550°C to yield high-purity crystalline flake.
VRFB 4-State Electrochemistry & Aerospace Alloys
Negative Electrode:
Standard Cell Potential: (open-circuit voltage ~1.4–1.5V).
Vanadium Extraction & VRFB Mastery Assessment
Validate your metallurgical chemistry, flow battery engineering, and project finance mastery across 4 industry-calibrated questions.