FLNG Project Finance & Liquefaction Economics
Model offshore Floating LNG (FLNG) capital expenditures, nameplate liquefaction throughput, feedgas shrinkage, tolling tariffs, turret mooring, debt service coverage (DSCR), and 20-year equity IRR.
FLNG Facility & Operational Controls
Annual Operating Waterfall & Cash Flow Split
Scenario Sensitivity Matrices
Matrix 1: LNG FOB Price ($/MMBtu) vs. Nameplate Capacity (MTPA) on Annual Project EBITDA ($M)
Evaluates operational earnings elasticity across global LNG price cycles.
Matrix 2: Facility Availability / Uptime (%) vs. Feedgas Cost ($/MMBtu) on 20-Year Equity IRR (%)
Models impact of offshore harsh weather downtime and upstream gas cost inflation on equity returns.
20-Year Project Debt & Equity Amortization Schedule
Senior Debt + Post-Amortization Equity Phase| Timeline | Gross Revenue ($M) | Feedgas Cost ($M) | Fixed OpEx ($M) | EBITDA ($M) | Debt Service ($M) | Net Equity CF ($M) | Cumulative Equity ($M) |
|---|
Engineering & Financial Architecture of Floating LNG Assets
1. The Mechanics of Cryogenic Marine Liquefaction
Floating LNG facilities extract raw natural gas from offshore subsea wellheads, separate acidic carbon dioxide and hydrogen sulfide via amine contactors, remove mercury and water, and liquefy the methane into LNG at \(-162^\circ\text{C}\) (\(-260^\circ\text{F}\)) at atmospheric pressure. This reduces gas volume by a factor of 600, enabling economical bulk ocean transport.
The liquefaction process requires massive aero-derivative gas turbines driving multi-stage centrifugal refrigerant compressors. In self-contained facilities, process fuel gas consumption (\(S_{\text{fuel}}\)) accounts for 8% to 12% of raw inlet gas:
2. Turret Mooring & Severe Metocean Resilience
Unlike land-based plants built on bedrock, an FLNG facility is subjected to multi-directional wind, waves, and surface currents. To prevent fatigue failure of subsea gas export risers, mega-FLNGs utilize internal or external disconnectable turret mooring systems that allow the vessel to weathervane 360 degrees into prevailing sea states.
Turret mooring systems represent $200M to $600M in CapEx and dictate offshore uptime availability (\(U\)). Typhoons, cyclonic storms, and side-by-side offloading swell limits constrain operating days to 330–350 days per year (90%–96% effective uptime).
3. Commercial Contracts: Merchant vs. Tolling Structure
In a Merchant Model, the FLNG developer takes full hydrocarbon commodity price exposure: purchasing upstream feedgas at domestic benchmark prices (e.g., Henry Hub or Brent slope) and selling liquefied LNG FOB to global traders. While upside leverage is substantial during energy crunches, commodity price downturns threaten project solvency.
In a Tolling Model, upstream oil & gas majors pay a guaranteed tolling tariff (\(T_{\text{toll}}\), typically $2.50 to $4.50/MMBtu) for liquefaction rights, while providing inlet gas and absorbing fuel shrinkage. The FLNG behaves as an offshore toll road, insulating equity sponsors from Henry Hub/TTF volatility.
4. Lender Debt Service Coverage Ratio (DSCR) Sizing
Non-recourse commercial bank facilities and Export Credit Agencies (ECAs) evaluate creditworthiness via the annual Debt Service Coverage Ratio:
To guarantee investment grade debt covenants, lenders determine the minimum breakeven LNG FOB tariff necessary to cover total fixed OpEx, inlet feedgas, and 1.35x debt service:
Frequently Asked Questions: FLNG Economics
Maritime, Offshore Energy & Infrastructure Labs
LNG Carrier Charter Lab
Model cryogenic time charter hire, natural BOG shrinkage, reliquefaction, canal tolls, and delivered netback.
FPSO Field Economics Lab
Model deepwater offshore oil development, FPSO dayrates, subsea SURF CapEx, and project IRR.
LNG Netback & Pricing Lab
Model liquefaction tolling, Henry Hub to European TTF / Asian JKM spreads, and netback freight costs.
WTIV Charter Economics Lab