FLNG Project Finance & Liquefaction Economics

Model offshore Floating LNG (FLNG) capital expenditures, nameplate liquefaction throughput, feedgas shrinkage, tolling tariffs, turret mooring, debt service coverage (DSCR), and 20-year equity IRR.

Select Facility Archetype Preset:
Total Project CapEx
$3,400 M
Intensity: $1,417 /t
Annual Project EBITDA
$580.4 M
Net LNG: 2.23 MTPA
Lender DSCR Coverage
2.31x
Breakeven FOB (1.35x): $7.45 /MMBtu
20-Year Equity IRR
16.8 %
Equity NPV (10%): $620 M | Payback: 6.2 yrs

FLNG Facility & Operational Controls

MTPA
0.5 MTPA3.0 MTPA6.0 MTPA
%
Capital Expenditures ($M)
Merchant Feedgas & LNG Pricing
Associated Liquids & Condensate
Annual Fixed OpEx ($M/year)
Senior Debt & Financing Covenants

Annual Operating Waterfall & Cash Flow Split

Gross Revenue $1,230 M
Feedgas Cost $335 M
Fixed OpEx $171 M
Annual Debt Svc $251 M/yr
Thermal Energy Output: 116 M MMBtu
OpEx per MMBtu: $1.48 /MMBtu
Condensate Revenue: $142 M/yr

Scenario Sensitivity Matrices

Matrix 1: LNG FOB Price ($/MMBtu) vs. Nameplate Capacity (MTPA) on Annual Project EBITDA ($M)

Evaluates operational earnings elasticity across global LNG price cycles.

Matrix 2: Facility Availability / Uptime (%) vs. Feedgas Cost ($/MMBtu) on 20-Year Equity IRR (%)

Models impact of offshore harsh weather downtime and upstream gas cost inflation on equity returns.

20-Year Project Debt & Equity Amortization Schedule

Senior Debt + Post-Amortization Equity Phase
Timeline Gross Revenue ($M) Feedgas Cost ($M) Fixed OpEx ($M) EBITDA ($M) Debt Service ($M) Net Equity CF ($M) Cumulative Equity ($M)

Engineering & Financial Architecture of Floating LNG Assets

1. The Mechanics of Cryogenic Marine Liquefaction

Floating LNG facilities extract raw natural gas from offshore subsea wellheads, separate acidic carbon dioxide and hydrogen sulfide via amine contactors, remove mercury and water, and liquefy the methane into LNG at \(-162^\circ\text{C}\) (\(-260^\circ\text{F}\)) at atmospheric pressure. This reduces gas volume by a factor of 600, enabling economical bulk ocean transport.

The liquefaction process requires massive aero-derivative gas turbines driving multi-stage centrifugal refrigerant compressors. In self-contained facilities, process fuel gas consumption (\(S_{\text{fuel}}\)) accounts for 8% to 12% of raw inlet gas:

$$V_{\text{feedgas, req}} = \frac{V_{\text{LNG, MMBtu}}}{1 - (S_{\text{fuel}} / 100)}$$

2. Turret Mooring & Severe Metocean Resilience

Unlike land-based plants built on bedrock, an FLNG facility is subjected to multi-directional wind, waves, and surface currents. To prevent fatigue failure of subsea gas export risers, mega-FLNGs utilize internal or external disconnectable turret mooring systems that allow the vessel to weathervane 360 degrees into prevailing sea states.

Turret mooring systems represent $200M to $600M in CapEx and dictate offshore uptime availability (\(U\)). Typhoons, cyclonic storms, and side-by-side offloading swell limits constrain operating days to 330–350 days per year (90%–96% effective uptime).

3. Commercial Contracts: Merchant vs. Tolling Structure

In a Merchant Model, the FLNG developer takes full hydrocarbon commodity price exposure: purchasing upstream feedgas at domestic benchmark prices (e.g., Henry Hub or Brent slope) and selling liquefied LNG FOB to global traders. While upside leverage is substantial during energy crunches, commodity price downturns threaten project solvency.

In a Tolling Model, upstream oil & gas majors pay a guaranteed tolling tariff (\(T_{\text{toll}}\), typically $2.50 to $4.50/MMBtu) for liquefaction rights, while providing inlet gas and absorbing fuel shrinkage. The FLNG behaves as an offshore toll road, insulating equity sponsors from Henry Hub/TTF volatility.

4. Lender Debt Service Coverage Ratio (DSCR) Sizing

Non-recourse commercial bank facilities and Export Credit Agencies (ECAs) evaluate creditworthiness via the annual Debt Service Coverage Ratio:

$$\text{DSCR} = \frac{\text{EBITDA}}{\text{Annual Debt Service}} \ge 1.35\text{x}$$

To guarantee investment grade debt covenants, lenders determine the minimum breakeven LNG FOB tariff necessary to cover total fixed OpEx, inlet feedgas, and 1.35x debt service:

$$P_{\text{FOB, be}} = \frac{1.35 \cdot \text{DS} + \text{Feedgas Cost} + \text{Fixed OpEx} - \text{Condensate Margin}}{V_{\text{LNG, MMBtu}}}$$

Frequently Asked Questions: FLNG Economics

FLNG integrates offshore gas treating, cryogenic refrigeration (-162°C), LNG storage, and tandem or side-by-side offloading directly aboard a floating hull. This eliminates long-distance subsea pipelines to shore and terrestrial site development costs, monetizing stranded or remote offshore gas fields. However, FLNG requires ultra-compact marinized topsides, expensive internal or external turret mooring systems to weather typhoons, and incurs higher marine insurance and support vessel charter OpEx.

In a merchant contract model, the FLNG owner purchases upstream feedgas (paying Henry Hub, TTF, or Brent-linked rates) and bears commodity price risk when selling LNG FOB to global buyers. In contrast, under a tolling agreement, upstream equity owners retain title to the natural gas, provide inlet feedgas and absorb process shrinkage, and pay the FLNG operator a fixed liquefaction fee ($/MMBtu), creating stable infrastructure cash flows that support higher debt gearing (70% to 75% LTV).

Liquefying natural gas requires immense mechanical power to drive heavy refrigerant compressors (e.g., mixed refrigerant or dual nitrogen cycle). Aero-derivative gas turbines consume 8% to 12% of total inlet raw gas as process fuel gas, which is known as fuel shrinkage. In merchant operations, higher fuel shrinkage increases effective feedgas costs, requiring higher LNG FOB sale prices to achieve debt service coverage hurdles.

Commercial banks and export credit agencies (ECAs) typically require a minimum annual Debt Service Coverage Ratio (DSCR) of 1.30x to 1.40x for merchant FLNG assets with spot market exposure, and 1.20x to 1.30x for long-term tolling agreements backed by investment-grade off-takers. Lenders size maximum debt against the P90 production forecast and breakeven LNG FOB tariff.

Maritime, Offshore Energy & Infrastructure Labs

LNG Carrier Charter Lab

Model cryogenic time charter hire, natural BOG shrinkage, reliquefaction, canal tolls, and delivered netback.

FPSO Field Economics Lab

Model deepwater offshore oil development, FPSO dayrates, subsea SURF CapEx, and project IRR.

LNG Netback & Pricing Lab

Model liquefaction tolling, Henry Hub to European TTF / Asian JKM spreads, and netback freight costs.

WTIV Charter Economics Lab

Model turbine installation vessels, heavy crane limits, time-charter dayrates, and weather downtime.